Â
The Gateway, Blackpool
Location: Blackpool, Lancashire
Client: Blackpool Council
Opened: October 2006
An architect-led project where design was at the forefront.
The plan called for a cast in concrete, finished with coloured plaster.
Danfo’s solution was a bespoke Tetragon, built to fit inside the exterior cast; this building was lowered into the existing ‘eye’ structure shortly before opening in October 2006.
Since then, the installation has received a lot of praise and for its unsual design.
This public toilet provides 1 fully accesible facility, 3 unisex toilet rooms and 1 urinal.

